Get the latest price? We will reply as soon as possible (within 12 hours)

Argentina breweries model project

System

Item

Parameters

Qty(pcs)

Brew House System

(Steam

heating)

Malt miller

300Kg/h

1

Mash tun

1000L

1

Lauter tun

1000L

1

Wort pump

3T/H

1

Wort oxygenator

φ32 

1

Work platform

Matching

1

Brew house system valves&pipe

Assorted

1

Steam boiler

100Kg/h

1

Plate heat exchanger

8m2

1

Fermenting System

Fermentation tank

1000L

3

Yeast adding tank

10L

1

Plate frame filter

0.4t/h

1

Fermenting system valves&pipe

Assorted

1

Cooling System

Chiller machine

8HP

1

Ice water tank

2000L

1

Cool water pump

3T/H

1

Cooling system valves&pipe

Assorted

1

CIP system

Sterilizing tank/Alkali liquor Tank

50L

2

CIP trolley

As required

1

Washing pump

3T/H

1

CIP system valves&pipe

Assorted

1

Control System

Control cabinet

Temperature and Pressure Digital display control

1

beer equipment

WARRANTY:

1.Main product for 3 years and auxiliary parts for 1 year. 

2.Lifetime repair guarantee.

3.All spare parts and wearing parts are attached with the machinery for free.


SERVICE:

1.Free consultation service before,during,and after sales.

2.Project planning and design the layout service.

3.Free debugging instruction of equipment until everything is functional.

4.Management of equipments' long distance shipping from seller's factory to named pord or station by buyer.

5.Training of equipment maintenance and operation personally.

6.New production techniques.